INDEPENDENT POLICY & RESEARCHConceptual framework Edition 0.16.4
CORE-002 · Method 0.2.0

Serial service bottleneck

What is the theoretical service ceiling of this serial chain for one common period?

Operational calculation / structured check · Unit tested · Not empirically calibrated

Worked example

A food distribution team can compare loading, transport and receiving on one serial route. Use the parallel delivery calculator when shipments can take different routes.

Finds the smallest capacity in a required serial chain and all tied limiting stages.

Try it yourself

The calculator opens with the fictional example already filled in. Change one input, choose Calculate locally, and compare the result to the original values below. Use Reset fictional fixture to start over.

An unknown result means the available inputs do not support a value. Check the calculator’s Warnings tab for what is missing or uncertain.

Go to the calculator Browse all calculators

Changing the label does not improve capacity, speed, error rates or confidence. Enter measured differences explicitly.
Comparison conditions and human review
Record budget, staffing, resources, information release dates, scenario conditions and evaluation criteria. Material differences can make options not comparable.

This declaration is not legal certification. Blocked, pending or assumed gates stop transaction-dependent evaluation.

Keep units consistent within each table. Enter zero when the amount is known to be zero. Leave optional amounts blank when they are unknown. If a required value is missing, the calculator will ask for it.

Advanced: complete input envelope and optional fields

Edit optional fields using the method dictionary. Apply validates and recalculates the entire input. Unknown values remain null.

Import local JSON or CSV

Files stay in this browser. Maximum 1 MiB. JSON imports are recalculated. CSV supports flat observation tables, with column types taken from the displayed fixture. Empty cells become null.

Compare the arrangements

Keep physical resources and evaluation conditions equal. With identical inputs, all three approaches produce identical arithmetic. The comparison refuses material differences in declared conditions; it does not verify those declarations.

Privacy: comparison inputs may contain sensitive notes or operational details. Storage is off by default. Do not enter personal records or sensitive infrastructure details. Reproduction exports include supplied inputs and notes, including raw small-cell inputs suppressed from CORE-009 result tables. Suppression of displayed results does not make a reproduction export safe to publish.

Executive brief and reproducible export

Review for personal, confidential or sensitive material before saving or sharing. No automatic submission occurs.

Read the generated brief

Method, inputs and limits

Finds the smallest capacity in a required serial chain and all tied limiting stages. Method version 0.2.0. Schedule queues, model parallel paths, infer completions or guarantee service.

CORE-002 input dictionary
InputUnit / typeRequired interpretation
demand — Demand during the declared periodobservations.unit / numberUse the supplied schema and declared units. Minimum 0.
period — Common capacity periodtext / textUse the supplied schema and declared units.
stages — Required serial stagesobservations.unit / jsonRows require id, label, capacity and matching unit. If measuredAvailability is a fraction from 0 to 1, capacity is rated and adjusted. Null means rated with unknown availability. Omit measuredAvailability when capacity already represents usable throughput.
topology — Topology (serial only)text / textUse the supplied schema and declared units.
changedStage — One hypothetical stage changematching capacity units / jsonOptional parameters.changedStage with id and effectiveCapacity. Shows the change at the same demand.

Visible mathematics / decision rules

effective capacity = rated capacity × measured availability when supplied; serial ceiling = min(effective stage capacities)

supported service = min(demand, theoretical ceiling)

unmet demand = demand − supported service

What this result cannot establish

What would falsify the assumptions?

Reproducible fictional fixture and independently calculated expectations

This fixture is synthetic. It does not describe a country, government, company or event.

{
  "observations": {
    "unit": "requests/day",
    "origin": "synthetic",
    "sources": [
      {
        "id": "SYN-001",
        "kind": "synthetic",
        "label": "Fictional serial service chain",
        "url": null
      }
    ],
    "period": "one declared day",
    "demand": 100,
    "stages": [
      {
        "id": "intake",
        "label": "Intake",
        "capacity": 120,
        "unit": "requests/day"
      },
      {
        "id": "review",
        "label": "Review",
        "capacity": 80,
        "unit": "requests/day"
      },
      {
        "id": "delivery",
        "label": "Delivery",
        "capacity": 90,
        "unit": "requests/day"
      }
    ]
  },
  "parameters": {
    "topology": "serial"
  }
}

Expected checks

{
  "theoreticalCeiling": 80,
  "supportedService": 80,
  "unmet": 20
}
Download input fixture

Authoritative background references

These sources inform definitions or review practices. They do not validate this implementation or endorse MAR.

Read the priority-order capacity example